Andhra Pradesh Invites Bids for Turbines for 950 MW Pumped Storage Project
The last date to submit bids is March 13, 2026
February 26, 2026
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Andhra Pradesh Power Generation Corporation (APGENCO) has invited bids for the design, engineering, manufacturing, and commissioning of three 238/270MW and two 118/135 MW vertical Francis reversible pump turbines and synchronous motor-generator sets for the 950 MW Kamalapadu pumped storage project (PSP) in the Ananthapuramu district.
