E-MAIL FOR SPONSORSHIP

Andhra Pradesh Proposes Multi-Point Connectivity for Wind-Solar Projects

The original regulation was notified on September 12, 2025

thumbnail

Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights


The Andhra Pradesh Electricity Regulatory Commission (APERC) has issued the draft second amendment to the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025, intended to remove the condition that renewable hybrid energy projects and renewable energy with storage projects be connected at a single interconnection point. 

Continue Reading with Premium Access

Get unlimited access to in-depth analysis, exclusive interviews, and comprehensive coverage of India's renewable energy sector.

Unlimited article access
Exclusive market insights
Premium research reports
Ad-free reading experience
Loading subscription plans...

RELATED POSTS

Get the most relevant India solar and clean energy news.

RECENT POSTS