Now, Andhra Pradesh Decides to Withdraw Connectivity of 98 MW of Wind Projects
According to the letter, approvals were given for 2,193 MW of projects against the sanctioned capacity of 2,095 MW at the 400 kV Uravakonda substation
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
In a letter to its chief engineer, the Transmission Corporation of Andhra Pradesh (APTRANSCO) has instructed the removal of “irregular connections and loads” from wind energy projects.