Regulator Upholds Grid Connectivity of Hybrid Projects from Two Points
MNRE and the Ministry of Power also allow connectivity of hybrid renewable projects at multiple locations
February 15, 2024
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Madhya Pradesh Electricity Regulatory Commission (MPERC) has clarified that Regulation 2(xix) of the MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2021 expressly states that hybrid renewable projects can be situated at two distinct locations and are permitted to inject power into the grid from two points.