Levelized Cost of Storage for Standalone BESS Could Reach ₹4.12/kWh by 2030: Report
Battery energy storage system based on low-cost lithium-ion batteries can enable India to meet the morning and evening peak demands.
June 2, 2020
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Government of India (GoI) has set a target of achieving 175 GW of renewable power installed capacity by December 2022. However, the capacity value of these variable renewable energy resources is limited without grid-scale energy storage.