Madhya Pradesh Lowers Rooftop Solar Tender Capacity from 25 MW to 15 MW, Removes DCR Clause
The deadline for the submission of bids is June 16, 2020
June 9, 2020
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has reduced the capacity of its earlier tender floated for the installation of 25 MW of grid-connected and off-grid rooftop solar projects. The capacity has now been cut down to 15 MW. Another modification in the tender is the removal of the domestic content requirement.