NTPC Invites Bids for Balance of System Works for 1.2 GW Solar Project
The last date for the submission of bids is December 6, 2023
November 2, 2023
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
NTPC Renewable Energy (NTPC REL), a wholly-owned subsidiary of NTPC, has invited bids for the balance of the system package for 1,200 MW (2 blocks of 600 MW each) Inter-State Transmission System (ISTS)-connected solar energy projects at NTPC REL’s 4,750 MW Khavda Renewable Energy Park – South Block.