NTPC Invites Bids for Pilot BESS Project at Dadri Thermal Plant
The last date to submit bids is February 02, 2025
January 15, 2025
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
NTPC has invited bids for a proof-of-concept battery energy storage system (BESS) pilot project to provide power backup for two units with a cumulative capacity of 420 MW at NTPC Dadri thermal power station, Uttar Pradesh.