Odisha Regulator Allows Net Metering for Rooftop Solar Capacity up to 500 kW
Systems of 5 to 500 kW must be installed under group net metering or virtual net metering framework
May 16, 2022
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Odisha Electricity Regulatory Commission (OERC) has allowed a net metering facility for rooftop solar systems up to 500 kW or up to the sanctioned load, whichever is lower, as long as it is within 75% of the transformer capacity.