SECI Amends Change in Law Clause in RfS for 3 GW Solar with 1.5 GW Manufacturing Tender
SECI had tendered the capacity in January 2019
March 13, 2019
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Solar Energy Corporation of India (SECI) has amended the provision for “Change in Law” in the Request for Selection (RfS) for the 3 GW interstate transmission system (ISTS)-connected solar photovoltaic (PV) capacity linked tender with 1.5 GW of manufacturing. This is the second time the RfS for this tender has been amended.