SECI’s ISTS-Connected Wind-Solar Hybrid Projects’ RfS Reduced to 1,200 MW from 2,500 MW
Maximum bid capacity has been increased from 500 MW to 600 MW
October 15, 2018
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Solar Energy Corporation of India (SECI) has amended the RfS for 2,500 MW of ISTS-connected wind-solar hybrid power projects (tranche-I).