States Achieve Half of the Allocated Rooftop Solar Capacity Under Phase II
Gujarat tops the list with 1.45 GW, followed by Kerala and Rajasthan
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
States have cumulatively installed only half of the allocated capacity of 3.38 GW in the residential rooftop solar segment as part of the Ministry of New and Renewable Energy’s (MNRE) Phase II Grid-Connected Rooftop Solar Program, the Union Power Ministry R.K. Singh told the Rajya Sabha.