Uttar Pradesh Regulator Allows Solar Energy Generator to Withdraw Banked Energy
The state DISCOM was directed to file its response within three weeks for withdrawal of banked energy
February 21, 2022
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
The Uttar Pradesh Electricity Regulatory Commission (UPERC), in a recent petition, heard a solar energy generator’s request to withdraw the banked power. The Commission ruled that appropriate treatment of the banked power was required only for the period from January 2021 to March 2021, for which the period of withdrawal had lapsed.