wind
The supply mismatch between India’s solar module and cell capacity has had an unlikely fallout: low utilization of module manufacturing lines. With average capacity...
NTPC Renewable Energy (NTPC REL) has invited bids to develop a 215 MW wind energy project with connectivity to the state transmission utility in Madhya Pradesh. The...
The Central Electricity Regulatory Commission (CERC) has condoned the delay in filing an application for renewable energy certificates (RECs) for electricity generated...
Transmission infrastructure development has struggled to keep pace with India’s rapid addition of renewable energy generation capacity. Transmission projects...
The U.S. added 4.7 GW/17.2 GWh of utility-scale battery energy storage systems (BESS) in the second quarter (Q2) of 2026, taking the cumulative operational capacity past...
The Central Transmission Utility of India’s (CTUIL) sharp reduction in benchmark project costs could ease financial closure compliance for solar, wind, and battery...
SJVN has announced the winners of the auction to procure power from 600 MW of interstate transmission system (ISTS)-connected wind power projects (Phase-IV). Green...
Terra Clean has announced the winner of its auction to develop a 100 MW end-to-end intrastate transmission system (InSTS)-connected wind project in Gujarat. Inox Wind...
Ceramic and vitrified tiles manufacturer Kajaria Ceramics has signed a long-term power purchase agreement (PPA) with Gurugram-based renewable energy solutions provider...
The Middle East and North Africa (MENA) region’s cumulative solar and wind capacity is projected to reach 404 GW by 2035, up from 49 GW currently, according to...
The Central Electricity Authority’s (CEA) proposal to mandate co-located energy storage systems (ESS) for new ground-mounted solar and onshore wind projects could...
India added a record 27 GW of solar capacity in the first half (1H) of 2026, up 49% year-over-year (YoY) from 18 GW, according to Mercom India Research’s newly released...
The Central Transmission Utility of India (CTUIL) has revised the benchmark project costs for solar, wind, and battery energy storage system (BESS) projects used to...
The Central Electricity Authority (CEA) has proposed mandating co-located energy storage systems (ESS) for ground-mounted solar and onshore wind projects commissioned...
The Odisha Electricity Regulatory Commission (OERC) has approved the power sale agreement (PSA) between GRIDCO and the Solar Energy Corporation of India (SECI) for...
1
2
3
...
110














